Case Study: Former FDA Laboratory
- 100,000 square feet former FDA laboratory.
- Mission: Deconstruct building to frame at a lower cost and less time than traditional demo, while maximizing landfill diversion of all materials
- Developed waste management plan
- Found highest value markets for all salvageable/resale as is items.
- Found highest value markets for all recycling materials.
- Compared markets on items similar in value for salvage vs. recycling.
- Removed salvage items in a least cost method to owner (buyer usually paid).
- Developed Smart Deconstruction Plan.
- Hazmat removal cost lowered by over 50% due to open access.
- 85% of materials removed were diverted from landfills which contributed to lower deconstruction costs. Full documentation provided.
- Items above were completed during demo permit waiting time, reducing overall deconstruction time.
- Reduced the cost of overall demo by more than 50%.
- Less money, less time, less landfill - Mission Complete!!